Skip to content
Anytime 365 Days Secure Your Power QualityTM  Korean  Chinese  English  Japanese 搜索 咨询 +82-31-460-0000
瞬时停电 事故预防 解决方案 - "Smart POWER Vaccine®"

Sag事故补偿对策

  • Smart FACTORY的Smart POWER Infra PYRAMID

  • Smart POWER Infra using of Smart FACTORY [:Battery UPS & No-Battery TSP®]

    - By using the fast charge
    - discharge ultra-capacitor having over 10 years lifetime, the momentary voltage sag compensator TSP®
    - having 1 second duration of sag compensation with no maintenance
    - will be applied along with On-Line UPS used for 30 minutes of outage depending on the loads’ electric al feature and how critical the target loads are.

  • Smart POWER LAYER of Smart FACTORY

  • Smart POWER Vaccine® : TSP® (The Second POWER)

  • 自动化设备的瞬间电压补偿装置新技术标准
    Smart POWER Vaccine® : TSP® (The Second POWER)


  • Smart POWER Vaccine® : TSP® (The Second POWER)

  • Semiconductor Factory Application Cases
    Smart POWER Vaccine® : TSP® (The Second POWER)

  • Success Story of Instantaneous Voltage Drop Accident Compensation in Semiconductor Foundry Factory

  • JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total
    2005 V-sag number of occurrences - - 1 2 2 9 3 2 3 - 3 25
    Drop rate / Drop Time 11.8%
    73ms
    12.90%
    87ms
    17.70%
    53ms
    39.60%
    110ms
    50.90%
    180ms
    27.70%
    90ms
    77%
    213ms
    -
    -
    19.50%
    200ms
    -
    -
    Down Time[Hr] - - 24 153 96 456 1,054 681 1,609 - 188 - 4,261
    number of occurrences - - 1 13 4 129 277 181 173 - 19 - 797
    2006 V-sag number of occurrences - - - 2 3 5 6 3 - - 2 1 22
    Drop rate / Drop Time 31.80%
    120ms
    25.60%
    120ms
    27.80%
    95ms
    38.30%
    250ms
    49.70%
    115ms
    -
    -
    12.70%
    60ms
    13.00%
    95ms
    Down Time[Hr] - - - 8 - 21 25 70 - - - - 124
    equipment Down quantity(large) - - - 7 - 6 11 28 - - - - 52
    improvement[Hr] - - -24 -145 -96 -435 -1,029 -611 -1,609 - -188 - -4,137

  • - For the year 2005 vs 2006, the improvement effect was calculated by comparing the equipment down rate with establishment of the V-Sag compensation measures in 2006